Register now to gain access to all of our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, post status updates, manage your profile and so much more. If you already have an account, login here - otherwise create an account for free today!
new giga coaster 2014?
#1
Posted 14 August 2012 - 04:26 PM
#2
Posted 14 August 2012 - 04:27 PM
#3
Posted 14 August 2012 - 04:34 PM
#4
Posted 14 August 2012 - 04:34 PM
#5
Posted 14 August 2012 - 04:35 PM
Actually I wouldn't be so sure. Theme Parks think years in advance I bet.Thats 2 years from Now KI is probably more inluclant about working on whats going on now and probably not even thinking about '14 yet.
- Colonel_SoB_fan, Fire-Beast-OF FEAR, jcgoble3 and 1 other like this
#6
Posted 14 August 2012 - 04:37 PM
#7
Posted 14 August 2012 - 04:39 PM
#8
Posted 14 August 2012 - 04:55 PM
Actually I wouldn't be so sure. Theme Parks think years in advance I bet.
Thats 2 years from Now KI is probably more inluclant about working on whats going on now and probably not even thinking about '14 yet.
I know they do just like with diamond back. They started working on it in 2007
#9
Posted 14 August 2012 - 05:01 PM
- DIeseltech20 and TheCrypt like this
#10
Posted 14 August 2012 - 05:08 PM
i've been hearing things about a new giga coaster in 2014.
What a way to open a thread!
http://www.kicentral...ake-sobs-place/
http://www.kicentral...ation-location/
These are all good threads to discuss coming attractions.
#11
Posted 14 August 2012 - 05:16 PM
- Rc1111 and kaitlinfree like this
#12
Posted 14 August 2012 - 05:25 PM
#13
Posted 14 August 2012 - 05:29 PM
#14
Posted 14 August 2012 - 05:43 PM
Wooden Giga or Mega coasters are like impossible without leaving with a headache (Most of the time)
Well there has only been one mega and no gigas. We all know what happened with the first, but that was from a company known for its rough coasters.
#15
Posted 14 August 2012 - 05:49 PM
#16
Posted 14 August 2012 - 05:58 PM
EDIT: You learn something new every day!
#17
Posted 14 August 2012 - 06:02 PM
Who designed and built Beast? The two Hurlers?
- beastrider97 and Snowman like this
#18
Posted 14 August 2012 - 07:06 PM
The Hurlers, on the other hand, did not go quite so well...sure, they haven't seriously hurt or killed anyone, but those two are not exactly beloved by coaster lovers. Charlie Dinn & Co.>Paramount's Wooden Construction Team.
- beastrider97 likes this
#19
Posted 14 August 2012 - 07:10 PM
#20
Posted 14 August 2012 - 07:20 PM
Actually I wouldn't be so sure. Theme Parks think years in advance I bet.
Thats 2 years from Now KI is probably more inluclant about working on whats going on now and probably not even thinking about '14 yet.
I know they do just like with diamond back. They started working on it in 2007
and some people knew about Diamondback before 2007 its called Planning and Design
- CoasterGeek101 likes this
#21
Posted 14 August 2012 - 07:24 PM
That may well be true...granted, also when SOB was built, they still went ahead and for some reason used the defective wood instead of getting new, better wood...talk about going cheap-o. That might have been a huge factor in the ride's ultimate failure.
Plus, while there may be a few people at KI who worked on both Beast & Son on of Beast, I'd still assume at a lot of the crew was only on one or the other instead of both...though the old guys probably teach & train the newbies, and the park does an excellent job on upkeep on its other wooden coasters. Was it the sheer size of the ride that doomed it? Poor design? Which brings me to this rumor I heard once...
Son of Beast, when it was being designed, was originally to be built by INTAMIN. It was planned to be over 200' and have a loop, as the "final" version did, but would also be the first ride to debut the pre-fabricated wooden track (instead, Colossos @ Heide Park did) and it was supposed to even have PTC trains! Stengel was the designer. Paramount didn't like the design Stengel made for them, as it had several trim brakes and extra supports that would have made the ride cost too much in their eyes, so they changed it. Intamin and PTC refused to work on this ride if Paramount did not go with Stengel's plans, so they hired RCCO and Premier Rides instead. And then the bad stuff began...
That's just a rumor, but it sounds like one that might be true...not sure though. Does this sound plausible anyone?
#22
Posted 14 August 2012 - 07:26 PM
I just posted this a bit above.
#23
Posted 14 August 2012 - 07:28 PM
#24
Posted 14 August 2012 - 07:39 PM
Ahh...thank you for that, so it was just a rumor...
Sigh...it's kind of hard to pinpoint exactly where Son of Beast went wrong, isn't it? Design, Construction, It's Sheer Size, both sets of trains...it could have been any of these things, combinations of them, or none of them.
Which is quite disturbing if one is trying to wonder if another 200'+ wooden coaster is possible without topper track or Plug N' Play...and a GOOD wooden coaster too...
#25
Posted 14 August 2012 - 07:54 PM
#26
Posted 14 August 2012 - 08:43 PM
If Kings Island was building a roller coaster in 2014, they would already have begun planning.
And you're implying they aren't/haven't already because...?
#27
Posted 15 August 2012 - 12:30 AM
I think they have started. Probally not to long ago though. After they did DB, the Bomerang Bay remodel planning was after that. I say 2015 is the year.
If Kings Island was building a roller coaster in 2014, they would already have begun planning.
And you're implying they aren't/haven't already because...?
#28
Posted 15 August 2012 - 03:09 AM
If Kings Island was building a roller coaster in 2014, they would already have begun planning.
LMAO. OK!
#29
Posted 15 August 2012 - 06:44 AM
sigh.
- IBEW_Sparky, thekidd33, Voicetek and 1 other like this
#30
Posted 15 August 2012 - 01:05 PM
I think they have started. Probally not to long ago though. After they did DB, the Bomerang Bay remodel planning was after that. I say 2015 is the year.
If Kings Island was building a roller coaster in 2014, they would already have begun planning.
And you're implying they aren't/haven't already because...?
I never said they did start planning or they didn't start planning. What makes you think 2015 is the year?
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users
Sign In
Create Account
This topic is locked
Back to top








